The Prom Hill project was a supply and installation contract of 3 custom Supa-Span Arched structures, delivered to a remote location for mining purposes. The high-strength steel truss framing system of the Supa-Span structures has hot dip galvanised coating, and an industry-leading 15 year fabric and frame warranty.
The structures provide weatherproof shelters, and are structurally designed, engineered and manufactured to the highest Australian standards. 12383
Location:
South Australia
Completion Date:
2012
Size:
1,218sqm (13,110sqft)
Fabric:
Nova Shield FRU 88X-6 PE