Roy Hill Storage

A mineral storage facility was required for this project, with Fabritecture being chosen for supply and delivery. The chosen fabric structure was an Rapid-Span Post Mounted (RSPM) structure.

This Rapid-Span structure was optimal for the job due to the high strength corrosion resistant alloy frame and fully modular building design to meet the custom needs of the project. 14026

Location
Roy Hill,
Completion Date
2015
Size
1,904sqm (20,494sqft)
Materials
PVC
Sector
Mining
Download

Capability Statement

Download our capability statement to see how we’re leading innovation in lightweight architecture.

Subscribe

Stay updated with the latest in lightweight fabric architecture by subscribing to our newsletter. Get exclusive insights, project showcases, and industry news delivered to your inbox. Subscribe now and never miss an update!