Moranbah Aquatic Centre

The redevelopment of The Moranbah Aquatic complex by the Isaac City Council, was part of a AUD$6 million upgrade that included a refurbished 6 lane 50m pool and enclosed heated 25m pool, a children’s water play park and dry playground, shaded barbeque and eating areas and grandstand style seating.

Fabritecture’s project scope included design, construction, fabrication and installation of the fabric and steel structures. 11294

Location
Moranbah,
Completion Date
2012
Size
1,732sqm (18,643sqft)
Materials
Mesh + PVC
Download

Capability Statement

Download our capability statement to see how we’re leading innovation in lightweight architecture.

Subscribe

Stay updated with the latest in lightweight fabric architecture by subscribing to our newsletter. Get exclusive insights, project showcases, and industry news delivered to your inbox. Subscribe now and never miss an update!