

Hervey Bay Library & Administration Centre, Hervey Bay, QLD, features a large-scale perforated aluminium sunscreen facade, delivered under a design and construct scope. The facade wraps the building’s west, north, and south/east elevations, running from level 1 up past roof level within a total facade area of 2,162sqm.
The centre forms part of the revitalisation of Hervey Bay’s city centre. The facility has a gross floor area of around 13,500sqm across five levels plus basement parking, located on the corner of Main Street and Torquay Road in Pialba. It brings together an expanded two-level library and community hub, council administration space, a Disaster Resilience Centre, and new council chambers, alongside a new public plaza on Main Street and a pedestrian link through to the Pialba parklands. Construction began in 2024 and is due for completion in 2026.
The facade screen is made up of 460 individually pivoted aluminium sunscreens, folded and partially perforated, and distributed across 4 levels. Along the roof, panel heights taper off toward each end of the run. A network of 240 three-part awning assemblies supports the sunshades at multiple levels, enhancing both the functionality and visual character of the building. Maintenance access to the façade had been thoughtfully integrated into the building design, with permanent roof-mounted anchor points providing safe and efficient access to all areas of the façade.
Part of Fabritecture’s scope also included 2 powder coated aluminium canopies on the level 2 courtyards to provide shelter to the external areas.

Stay updated with the latest in lightweight fabric architecture by subscribing to our newsletter. Get exclusive insights, project showcases, and industry news delivered to your inbox. Subscribe now and never miss an update!