The Moranbah Mining project required a large Supa Span fabric structure for a truck workshop on site. The structure was custom designed to house 3 x Cat 797F vehicles – two in a tray-down position, and one in a tray-up position.
The client required a solution that had a quick installation, but also something that was completely relocatable. Electrical and lighting systems were added to the structure to complete the installation.
The chosen Supa-Span was 47.5m wide x 25m long, with a 10.175m clear eve & 14.75m clear peak height. The structure also featured open ends, with mesh infills on the gables. 13078
Location:
Moranbah, QLD Australia
Completion Date:
2013
Size:
1,181sqm (12,712sqft)
Fabric:
Polyethelene (PE)